main line work |
Post Reply ![]() |
Author | |
tom d ![]() Senior Member ![]() Joined: Nov 15 2008 Location: lakewood,ca Status: Offline Points: 156 |
![]() ![]() ![]() ![]() ![]() Posted: Jun 15 2011 at 9:18am |
tom d with help from alx replaced the frog and rail to the points on the switch going to the station on the cross over switch set.6-12-11 tom d and phil c worked on getting the track on the water siding next to the crossing a little better lined and leveld and added some balist.there is still some dips in the rail but its not as bad as it was. at some point we will be changing out this rail as it has wood ties on it so the dips will be gone than.tom d installed the last of the fill bords on driveway cossing than lined and leveld about 300 feet of track on the iner loop and outer loop main lines from the caboose to the yard this track was getting ruff so it shoud now be a better ride on run days.
|
|
![]() |
|
Sponsored Links | |
![]() |
Post Reply ![]() |
|
Tweet
|
Forum Jump | Forum Permissions ![]() You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |