Southern California Live Steamers - Miniature Railroad Photography By: Photography By: Photography By: Photography By:
Copyright 2009, Absolute Internet, Inc. All Rights Reserved.
Southern California Live Steamers Homepage
Forum Home Forum Home > Railroad Tracks, Layouts and Rolling Stock > Track, Switch & Signal Construction Forum
  New Posts New Posts RSS Feed - main line work
  FAQ FAQ  Forum Search   Events   Register Register  Login Login



main line work

 Post Reply Post Reply
Author
Message
tom d View Drop Down
Senior Member
Senior Member


Joined: Nov 15 2008
Location: lakewood,ca
Status: Offline
Points: 156
Post Options Post Options   Thanks (0) Thanks(0)   Quote tom d Quote  Post ReplyReply Direct Link To This Post Topic: main line work
    Posted: Jun 15 2011 at 9:18am
tom d with help from alx replaced the frog and rail to the points on the switch going to the station on the cross over switch set.6-12-11 tom d and phil c worked on getting the track on the water siding next to the crossing a little better lined and leveld and added some balist.there is still some dips in the rail but its not as bad as it was. at some point we will be changing out this rail as it has wood ties on it so the dips will be gone than.tom d installed the last of the fill bords on driveway cossing than lined and leveld about 300 feet of track on the iner loop and outer loop main lines from the caboose to the yard this track was getting ruff so it shoud now be a better ride on run days. 
Back to Top
Sponsored Links



Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.047 seconds.