Saturday Nov. 12 Tim, Phil C. and new member Tom Downing leveled the ground for the new container and trackage. On Sunday Tim and Phil C. built and inserted a new switch into the far South yard track to branch it into the new container with 2 new tracks.
Pressure treated 2x4s were used instead of plastic ties for the switch construction and track. A second switch will need to be fabricated and remaining track put down to lead to the container. The project is coming along well and should be completed by the following weekend.
Volunteers are welcome to help lay the new sections of track, shovel ballast and all that fun stuff.
|
|
![]() |
|
Sponsored Links | |
![]() |
|
tom d ![]() Senior Member ![]() Joined: Nov 15 2008 Location: lakewood,ca Status: Offline Points: 156 |
![]() ![]() ![]() ![]() ![]() |
12-13 tom d cut back dirt and leveled between new container and tunnel making a nice walkway to get around the container. sunday 12-14 phil, my two boys ,and I tom d played trains than ajusted the swich by the driveway and worked on leveling the track tell it got too dark and cold to work, we had a lot of fun I will try to take photos next time
|
|
![]() |