Send
this image as an E-Postcard to a friend. Click
HERE  |
|
|
| Picture
Title: |
Wolf installed new steel rail |
| Location: |
|
| Photographer: |
Tom Downing |
| Submission
Date: |
6/22/2022 12:37:06 PM |
| Comments: |
Wolf installed the new steel rail than Tom and Jen’s dropped ballast stone on it. Tom then leveled the track and tamped the stone down around the ties. |
| Gallery Category: |
Track Construction |
| Technical
Information: |
| Shooting Location: |
|
| Owner: |
|
| Locomotive Name or Road: |
|
| Locomotive or Car Type: |
|
| Whyte Classification |
Numeric: Name: Layout: Class: |
| Track Gauge: |
7.5 |
| Scale: |
|
|
|