The Train Gallery of Tom Downing
Tom has 838 images online
|
A lot of digging |
Remove switch’s to get rid of the ruff track |
|
The first replacement water tank |
New water tower base being installed |
|
Old water tower coming down |
PE pole |
|
The type of caboose Andrew is planning to build |
Caboose Frame cabin support welded on |
|
Caboose center beam is all welded up |
Caboose frame getting painted |
|