The Train Gallery of Tom Downing
Tom has 1111 images online
|

GP9 project, getting ready to machine all the parts for the brake rigging on the trucks |

GP9 project, working on mounting the brakes to the trucks |
|

GP9 project, trucks all assembled and painted |

GP9 project, coupler pockets, welded together |
|

GP9 project, frame ends drilled, tapped, and welded together |

Charlie and Kaylee Painting, the sign on the end the containers |
|

GP9 project, frame all welded together |

GP9 project, 8 hp DC motor mounted on the chassis |
|

Ballasting and leveling the track on the turn coming out of the depot |

GP9 build, body tech welded together |
|